BUILDING COMMISSION NSW: 2024 Member Update ON DEMAND

BUILDING COMMISSION NSW: 2024 Member Update ON DEMAND

BUILDING COMMISSION NSW:  2024 Member Update

Formal CPD: 2 Points 

ON DEMAND

Overview

The Building Commission NSW is the state’s first ever dedicated building regulator.
A new, fit-for-purpose building regulator, the Commission brings together teams from NSW Fair Trading and the Office of the Building Commissioner into one, to provide an integrated and consistent approach to ensuring confidence in residential building quality in NSW.

This Institute of Architects event provides the opportunity to hear directly from NSW Building Commissioner and his team.

 

2015 NSCA PERFORMANCE CRITERIA 

This presentation is equivalent to 2 hours/points of formal CPD and will deliver outcomes related to the following Competencies from the National Standard of Competency for Architects 2015:

Design: Conceptual Design
3.7 Assessment and integration of construction systems and materials consistent with project brief.

Design: Schematic Design
4.4 Inclusion of expertise of relevant specialists and consultants in developing the project design.
4.6 Investigation and integration of appropriate material selection for the project design.

Documentation: Detailed Design
5.3 Evaluation and integration of regulatory requirements.
5.4 Integration of structural and construction systems in resolved project design.
5.5 Integration of materials and components based upon an understanding of their physical properties.

Documentation: Documentation Project Delivery
6.1 Identification and adoption of a strategy, program and process of documentation integrated through all project stages to enable project delivery.
6.4 Timely completion and communication of accurate and comprehensible documents that will include, as required, drawings, models, specifications, schedules and other relevant modes of information.
6.7 Establishment of quality assurance systems to ensure consistency and completeness of project documentation in accordance with the requirement for the project brief, project timeframe and project budget.
6.8Project documentation is in accordance with, and appropriate to, the project contract and project procurement procedure.

Project Delivery: Construction Stage Practice Management
8.1
Selection process for appropriately qualified contractors is in accordance with procurement method and project contract.
8.3
Identification and application of the process and administration systems needed to fulfil all obligations under project contract.
8.7
Identification and application of appropriate and consistent systems for record keeping and maintenance of document revisions.

Practice Management
9.7
Knowledge of legal and regulatory requirements and obligations in regard to architectural practice, practice management and registration as an architect.
9.8
Clear and consistent communication with client and relevant stakeholders throughout project.

          

2021 NSCA PERFORMANCE CRITERIA 

This presentation is equivalent to 2 hours/points of formal CPD and will deliver outcomes related to the following Competencies from the National Standard of Competency for Architects 2021:

Practice Management and Professional Conduct
PC 1 Comply with the regulatory requirements and obligations pertaining to practice as an architect, including legislation, professional codes of conduct, obligations for continuing professional development and professional indemnity insurance.
PC 6 Be able to apply appropriate processes for reporting and varying the scope of services provided by an architect.
PC 7 Apply and follow processes for clear and consistent communication with clients and relevant stakeholders throughout the project, including obtaining approvals from clients and stakeholders. 
PC 13 Be able to identify and apply strategies, programming and processes for documentation through all project stages to facilitate project delivery, as appropriate to selected procurement processes. 
PC 14 Be able to identify and apply construction services provisions and/or construction administration systems needed to fulfil all obligations appropriate to the procurement process in accordance with the terms of the agreement.
PC 16 Be able to apply risk management and mitigation strategies – including safety in design, project risk, requirement for resilience from the impacts of climate change and appropriate insurances – across architectural services.

Detailed Design and Construction Documentation
PC 37 Be able to produce timely, accurate, complete and comprehensible documentation of the design so that it can be constructed.
PC 39 Be able to integrate the material selection, structural and construction systems established in the conceptual design into the detailed design and documentation.
PC 41 Be able to coordinate and integrate input from specialists and consultants into the detailed design and documentation.
PC 46 Be able to produce project documentation that meets the requirements of the contract and procurement process and complies with regulatory controls, building standards and codes, and conditions of construction and planning approvals.
PC 47 Be able to complete and communicate on-time, accurate documents for relevant stakeholders, including drawings, models, specifications, schedules and construction documentation.


Design Delivery and Construction Phase Services
PC 55 Be able to apply appropriate and consistent systems for record keeping, document control and revision status during the construction phase.
PC 56 . Be able to apply appropriate and consistent systems for identification of defects, rectifications and approval of substitutions.
PC 58 Complete documentation – including specifications, drawings, schedules, reports, certification and approvals – and other project information for issue to the client and relevant authorities, as required under the construction contract and relevant building and planning codes.

          

Learning Outcomes

At the end of this presentation you should be able to:

1. Demonstrate an overall understanding of the Design and Building Act and Regulation 
2. Clearly explain the process of registration for architects as Design Practitioners 
3. Enumerate the responsibilities of registered Design Practitioners 
4. Describe the powers of the Office of the Building Commissioner  
5. Identify current compliance issues as identified by the Office's auditing activities 

 

Speaker

David Chandler OAM

NSW Building Commissioner
Building Commission NSW

David Chandler, OAM was appointed NSW Building Commissioner in 2019 after an impressive forty year career in the Australian construction industry. In his capacity as NSW Building Commissioner David is improving the quality of construction and restoring trust in the industry through leading the delivery of Construct NSW, in collaboration with the sector. David was awarded an Order of Australia Medal in 1989 for his services to the construction industry.

 

References

New South Wales Office of Fair Trading: https://www.fairtrading.nsw.gov.au/housing-and-property/changes-to-class-2-buildings                                                                                                                                                                                                           
          

Price

Member: $99
Non-Member: $149


What Do I Do Next?

1. You will receive an automated registration email upon purchase. Follow the link in this email to take you to the course material on our online CPD platform.
2. You may have to click the green "log in via members site"  button to log into the online CPD platform. (Please do not input your credentials into the CPD site. Instead, to log in hit the “log in via members site” green button). You may be redirected to our members portal to log in with your credentials there.
3. Accept the T&Cs if it is your first time on the online platform, and hit “my dashboard” to find your purchased course.
4. Undertake your course at your own pace.
5. Once you have completed all the course material, you will be prompted to complete your assessment and feedback, after which your formal CPD certificate will be made available.